The diversion dam on the Puntledge River
Located downstream from the Comox Lake impoundment dam, the diversion dam diverts a portion of the water in the Puntledge River into into BC Hydro’s penstock system. Water in the penstock flows to the Puntledge Generation Station, and additionally supplies water to the Puntledge Hatchery and the Comox Valley Regional District water supply system.