Puntledge penstock pipeline

BC Hydro,Puntledge penstock pipeline,Puntledge Generating Station

The Puntledge Generating Station penstock pipeline has two sections – Above, the low pressure wood stave section that runs from the Puntledge River diversion dam, and below, the high pressure welded steel section that runs into the generating station.

BC Hydro,Puntledge penstock pipeline,Puntledge Generating Station

Similar Posts:

This entry was posted in hiking, Puntledge and tagged , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *