Tag Archives: BC Hydro

Island signs – Comox Lake Dam

I’d like to think that people would understand that a dam is not a great place for swimming, but the signs at the Comox Lake dam indicate otherwise.

Posted in Uncategorized | Tagged , , , , , , | Leave a comment

Comox Lake Dam – the spillway

The Comox Lake impoundment dam spillway Water flows over the spillway when the level of Comox Lake reaches 135.33 meters above sea level. The Comox Lake dam is a 142 m-long concrete gravity structure with a crest elevation of 137.55 … Continue reading

Posted in summer | Tagged , , , , | Leave a comment

John Hart dam

John Hart dam

Posted in Uncategorized | Tagged , , , , | Leave a comment

John Hart penstock

The three wood stave penstocks running from John Hart Lake to the generating station

Posted in Uncategorized | Tagged , , , , | Leave a comment

John Hart surge towers

The three surge towers at BC Hydro’s John Hart Generating Station The 90-metre tall white surge towers are in place to prevent the penstocks from bursting during periods of low production when the flow gates are closed. They will be … Continue reading

Posted in Uncategorized | Tagged , , , , | Leave a comment

Comox Lake – July 2016

I took a quick trip out to Comox Lake in late July to check the water level at the forebay area of the BC Hydro impoundment dam – besides providing a great visual indication of the water level, I can … Continue reading

Posted in lakes, Puntledge, summer | Tagged , , , , | Leave a comment

John Hart penstock pipelines

In 1946, a portion of Elk Falls Provincial Park was transferred to the BC Power Commission for construction of the John Hart hydroelectric project near Campbell River. The project included the construction of three 12’ diameter wood stave pipelines to … Continue reading

Posted in Uncategorized | Tagged , , , , , | Leave a comment

Puntledge River diversion dam

The diversion dam on the Puntledge River Located downstream from the Comox Lake impoundment dam, the diversion dam diverts a portion of the water in the Puntledge River into into BC Hydro’s penstock system. Water in the penstock flows to … Continue reading

Posted in Puntledge, river | Tagged , , , , | Leave a comment

Puntledge penstock pipeline

The Puntledge Generating Station penstock pipeline has two sections – Above, the low pressure wood stave section that runs from the Puntledge River diversion dam, and below, the high pressure welded steel section that runs into the generating station.

Posted in hiking, Puntledge | Tagged , , | Leave a comment

John Hart Penstock

Upper, wooden section of the penstock pipelines The upper, 3.6 metre diameter wood stave section running from the six-gate intake facility located at the intake dam on John Hart Reservoir is  1.1 kilometres long – it’s the low pressure section. … Continue reading

Posted in Uncategorized | Tagged , , , , | Leave a comment