Tag Archives: bridge

E&N Victoria Subdivision – Mile 98.60 French Creek bridge

The E&N bridge over French Creek

Posted in bridges, E&N, French Creek, rail, trains | Tagged , , , , , , | Leave a comment

E&N Victoria Subdivision – Mile 98.60 French Creek bridge

The E&N bridge over French Creek

Posted in bridges, E&N, French Creek, rail, trains | Tagged , , , , , , | Leave a comment

E&N Victoria Subdivision – Mile 119.50 Cook Creek North Fork bridge

The E&N bridge over  the north fork of Cook Creek

Posted in bridges, E&N, rail, trains | Tagged , , , , , | Leave a comment

E&N Victoria Subdivision – Mile 119.20 Cook Creek South Fork bridge

The E&N bridge over  the south fork of Cook Creek

Posted in bridges, E&N, rail, trains | Tagged , , , , , | Leave a comment

Over the road

Looking down on Buckley Bay Road – also known as the Highway 19 Connector

Posted in bridges | Tagged , , | Leave a comment

Buckley Bay – the view from the bridge

BC Ferries Buckley Bay terminal viewed from the E&N bridge over Buckley Bay Road

Posted in bridges, rail | Tagged , , , , , , , , | Leave a comment

E&N Victoria Subdivision – Mile 93.0 Englishman River bridge

The E&N bridge over the Englishman River, with the Highway 19 bridge in the background. Above, looking north along the line, and below, looking to the south

Posted in bridges, E&N, rail, trains | Tagged , , , , , , , | Leave a comment

Rosewell Creek – the bridge

Low August water flows provided an opportunity to take a look under the bridge leading to the Roswell Creek hatchery. Despite looking totally dry, there was water flowing about 100 metres upstream of the bridge.

Posted in bridges, hatchery, nature, river, summer | Tagged , , | Leave a comment

E&N Victoria Subdivision – Mile 120.10 Berray Road crossing

E&N crossing at mile 120.10 – Berray Road Looking toward the hatchery and Georgia Strait Looking toward Qualicum Looking toward the Rosewell Creek bridge at mile 120.20

Posted in bridges, E&N, rail, trains | Tagged , , , , , , , | Leave a comment

E&N Victoria Subdivision – Mile 124.10 Mill Creek bridge

The E&N bridge over Mill Creek Height: 40 ft Total Length: 173 ft Spans: 65’-4” (DPG), 106’-4” (DT)

Posted in bridges, E&N, rail, trains | Tagged , , , , , , , | Leave a comment